Busy busy busy!

Regular visitors will have notived that I’ve been a wee bit quiet on here recently, the reason being that we’ve been so busy working on the house.
So we have:

  • Fitted a mixer shower
  • Stripped the 3rd bedroom
  • Started to wallpaper the third bedroom
  • Papered and painted the ceiling of the third bedroom
  • Painted the skirtings and doorframe of, yes, the third bedroom
  • Put up curtains in our room
  • Started to strip the 2nd bedroom
  • Dug all the flower beds over and removed all the weeds and grass
  • Fixed a leaky overflow on the cold water tank
  • Fitted a gutter and water butt on the greenhouse
  • Fitted a new back door

… and plenty of little jobs I can’t even remember.

Still on the list of things we have to do:

  • Finish wallpapering the third bedroom and sink the sockets and switches into the wall
  • Finish stripping the second bedroom
  • Install radiators and piping in both the second and third bedrooms.
  • Install a boiler for the radiators and hot water (actually we’re paying someone to do this for us :-o )
  • Install radiators and piping to all the other rooms
  • Carpet upstairs
  • etc …

I’m hoping to have photos of all the above as we finish them, but this will not be for a while as we haven’t even set the computer up yet!

This entry was posted in General, Home. Bookmark the permalink.

Leave a Reply

Your email address will not be published.

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>