Busy busy busy!

Filed under: — ShadyCraig @ 12:14 pm
         

Regular visitors will have notived that I’ve been a wee bit quiet on here recently, the reason being that we’ve been so busy working on the house.
So we have:

  • Fitted a mixer shower
  • Stripped the 3rd bedroom
  • Started to wallpaper the third bedroom
  • Papered and painted the ceiling of the third bedroom
  • Painted the skirtings and doorframe of, yes, the third bedroom
  • Put up curtains in our room
  • Started to strip the 2nd bedroom
  • Dug all the flower beds over and removed all the weeds and grass
  • Fixed a leaky overflow on the cold water tank
  • Fitted a gutter and water butt on the greenhouse
  • Fitted a new back door

… and plenty of little jobs I can’t even remember.

Still on the list of things we have to do:

  • Finish wallpapering the third bedroom and sink the sockets and switches into the wall
  • Finish stripping the second bedroom
  • Install radiators and piping in both the second and third bedrooms.
  • Install a boiler for the radiators and hot water (actually we’re paying someone to do this for us :-o)
  • Install radiators and piping to all the other rooms
  • Carpet upstairs
  • etc …

I’m hoping to have photos of all the above as we finish them, but this will not be for a while as we haven’t even set the computer up yet!